女人一丝丝不挂,公与淑婷厨房猛烈进出,我的小后妈韩剧在线看免费高清版,精品无码一区二区三区

導(dǎo)航:全球石油化工網(wǎng) >> 資訊頻道 >> 技術(shù)裝備

斯倫貝謝公司的兩項(xiàng)鉆井新技術(shù)(英)

[加入收藏][字號(hào): ] [時(shí)間:2009-03-30 JPT 關(guān)注度:0]
摘要:簡(jiǎn)介:最近,油田服務(wù)公司巨頭斯倫貝謝發(fā)布了兩項(xiàng)新的鉆井技術(shù),通過(guò)應(yīng)用這兩項(xiàng)技術(shù),能夠改進(jìn)地面與地下的信息交流,可以加快鉆井速度,延伸鉆井深度。 Oilfield services giant Schlumberger recently...

簡(jiǎn)介:最近,油田服務(wù)公司巨頭斯倫貝謝發(fā)布了兩項(xiàng)新的鉆井技術(shù),通過(guò)應(yīng)用這兩項(xiàng)技術(shù),能夠改進(jìn)地面與地下的信息交流,可以加快鉆井速度,延伸鉆井深度。

Oilfield services giant Schlumberger recently introduced two new drilling technologies that improve communication between the surface and downhole, allowing faster and farther drilling.

Orion II telemetry platform

When used with Schlumberger's EcoScope LWD service, the Orion II telemetry platform allows for transmission of multiple images, along with triple-combo measurement curves, even at penetration rates exceeding 250 ft per hour. 

Schlumberger’s new Orion II telemetry platform reportedly provides more reliable communication with bottomhole assemblies (BHAs) while drilling at higher penetration rates and/or longer boreholes. The platform is housed in a measurement-while-drilling (MWD)/logging-while-drilling (LWD) tool and combines new data-compression technology with new surface and downhole sensors that modulate and demodulate signals and overcome interference from drilling and rig noise, even in harsh environments. Downlink commands are sent in real time while drilling, without affecting the delivery or quality of measurement data being relayed back to the surface.

“With Orion II, more quality data and higher-resolution images can be transmitted at greater depths, enabling better drilling decisions to be made in real time,” said Ian Falconer, Schlumberger’s Marketing Manager for Drilling and Measurements. “Both drilling efficiency and geosteering accuracy are enhanced by the system, which holds the records for deepest downlink, deepest LWD and MWD transmission, and deepest directional control.”

The company stated that the recent extended-reach drilling record by Maersk Oil Qatar was successfully drilled and geosteered using Schlumberger tools running the Orion II telemetry platform.

PowerDrive vorteX RT RSS
 
Schlumberger also launched its new rotary steerable system (RSS) with wireless communicator known as the PowerDrive vorteX RT. The modular system transmits near-bit information above and below the BHA components such that accurate targets can be reached more quickly.

Induction-propagation antenna coils are used to generate and detect an electromagnetic field. The bi-directional, half-duplex communication can run in any formation type, and includes real-time gamma ray, resistivity, and neutron density information.

In addition, the RSS reduces stick/slip and maximizes torque, weight-on-bit, and penetration rates, allowing operators to optimize their drilling performance such that rig time, and hence cost, is reduced. “The ability to now communicate over a drilling motor power section enhances geosteering BHA capabilities and lets you place third-party hardware anywhere on the string,” said Falconer. “It is possible to fine-tune the borehole trajectory while drilling at high speed.”

The company highlighted one field application in which a Middle East operator was able to drill a 4,567-ft section with the new RSS in one run with no nonproductive time and a reduction in stick/slip from 100 to 25 revolutions per minute. This resulted in a 33% higher rate of penetration than the field average, with the well setting a field record for the longest 8 ½-in. hole drilled in a single run.
關(guān)鍵字: 鉆井 
關(guān)于我們 | 會(huì)員服務(wù) | 電子樣本 | 郵件營(yíng)銷 | 網(wǎng)站地圖 | 誠(chéng)聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號(hào)
主站蜘蛛池模板: 大邑县| 托克托县| 大洼县| 文成县| 壤塘县| 莆田市| 正蓝旗| 四会市| 缙云县| 准格尔旗| 伊川县| 怀化市| 堆龙德庆县| 浮山县| 钟祥市| 当阳市| 信宜市| 西吉县| 临城县| 清涧县| 横山县| 丰顺县| 双城市| 方山县| 大关县| 韩城市| 西林县| 绩溪县| 西盟| 阜康市| 雷波县| 灵山县| 翁源县| 龙游县| 商洛市| 商城县| 通榆县| 杭锦后旗| 杂多县| 花垣县| 宝山区|